Customization: | Available |
---|---|
After-sales Service: | Online Technical Support |
Grade: | Q235B, Q345b H-Section Steel |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Components Of The Warehouse:
Product Parameter:
Items | Specification | |
Main Steel Frame | Column | Q235, Q345 Welded H Section Steel |
Beam | Q235, Q345 Welded H Section Steel | |
Secondary Frame | Purlin | Galvanized C-style Steel/ Steel Tube |
Knee brace | Angle Steel | |
Tie rod | Circular Steel Tube | |
Brace | Round Bar | |
Vertical&Horizontal support | Angle Steel, Round Bar or Steel Tube | |
Cladding system | Roof panel | 50mm/75mm/100mm Thick EPS/Rock Wool/Glass Wool/PU Corrugated Sandwich Panel |
Corrugated Colored Steel Sheet | ||
Wall panel | 50mm/75mm/100mm Thick EPS/Rock Wool/Glass Wool/PU Sandwich Panel | |
Corrugated Colored Steel Sheet | ||
Accessories | Door | 850/900*2100mm EPS Sandwich Panel Door/Steel Security Door/ Rolling Door |
Window | UPVC Sliding Window/ Aluminum Alloy Sliding Window/ Louver/Customized | |
Gutter | Colored Steel Sheet/Aluminum Alloy Folded Piece | |
Downpipe | 100mm UPVC | |
Roof Load | In 50kg/Sqm (Colored steel panel surrounded) | |
Wind Load | Design According To Local Climate | |
Earthquake-resistance | 8 Grades | |
Structure Life Span | Up to 50 years | |
Paint Options | Frame Colors Optional |
FAQ:
1. Q: What kind of company you are, factory or trade company?
We are a manufacturer of prefab house,container house,warehouse, villa and so on, and our factory located in Quanzhou, Fujian Province.
2. Q: What could we provide for your steel structure building?
A: According to customers requirements, we could provide the main steel frame, roof floor decks, wall panels, doors and windows, sanitary appliance, tiles, ceiling and so on.
3. Q: How can I get the quotation of the project?
A: If you have drawing, we can offer you our quotation according to your drawing.
If you have no design, please provide the details, such as location, wind speed, dimension, material or other requirements, we could make the design and quotation according to your specification.
4. Q: How about your quality control?
A: We have got related quality control certificates. All the products processing including cutting, welding, bending, shot blasting, packing, storing, loading have strict quality control to ensure qualified products.
5. Q: What about the installation?
A: We would provide installation instruction for you, and technicians also could be sent to help you if it is necessary. However, the visa fee, air tickets, accommodation, and wages will be charged by the buyers.
6. Q: What is your payment?
A: T/T, L/C, and Trade Assurance on Alibaba are available.
Start-Established in 1993, one of the earliest prefabricated house manufacturers in China.
Concept-Build new and fast living house for clients all around the world.
Products-Devote ourselves to industrialization of prefabricated house.
Scale-Six branches in Chengdu, Quanzhou, Chongqing, Changsha and Shenzhen.
Technology-Third grade contract qualification of steel structure, ISO9001: 2000 quality system certification, ISO14001 environmental management system, OHS18001 of occupational health and safety and holding many patent technique
Strength-600 employees with 20% of technicians and managements.
Range-Our product widely used in construction site, transportation feild, petroleum, hydropower, and tourism etc.
Business Development -Leading enterprise in this field with customers from more than 40 countries.
1993- The company was founded in Xiamen
1999-Moved to Quanzhou
2001-Established Chengdu Headquarters
2003-Established Chongqing Branch
2005-Established Shenzhen Branch
2006-Construction of XILUODU Labor camp
2007-Established the international trading department
2008-Construction of temporary shelter for victims from wenchuan earthquake
2009-Aid construction projects in Pengzhou
2010-The historic breakthrough of sales
2012-Lifted the entire scale of enterprise
2013-Developed a series of new products
2014/2015-A series of visits abroad
2016-Resources combination
2017-Bulid Infinty