• Accurate Design Reusable Aluminium Formwork Concrete Houses for Project Site
  • Accurate Design Reusable Aluminium Formwork Concrete Houses for Project Site
  • Accurate Design Reusable Aluminium Formwork Concrete Houses for Project Site
  • Accurate Design Reusable Aluminium Formwork Concrete Houses for Project Site
  • Accurate Design Reusable Aluminium Formwork Concrete Houses for Project Site
  • Accurate Design Reusable Aluminium Formwork Concrete Houses for Project Site

Accurate Design Reusable Aluminium Formwork Concrete Houses for Project Site

Certification: ISO9001
Transport and Load: 20′/40′ Container
Wall: Customized Wall
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Accurate Design Reusable Aluminium Formwork Concrete Houses for Project Site pictures & photos
Accurate Design Reusable Aluminium Formwork Concrete Houses for Project Site
US $120-145 / Piece
Min. Order: 500 Pieces
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2012

Suppliers with verified business licenses

Secured Trading Service
Fujian, China
to see all verified strength labels (19)

Basic Info.

Model NO.
6061-T6
Keyword
Cotainer House
Application
Residences
Main Material
Aluminium Alloy
Product Name
Aluminium Formwork System
Use
Hotel, House, Office, Villa, Warehouse
Size
Customized Size
Panel Thickness
4mm
Color
Silver
Transport Package
Pallet
Trademark
GETO
Origin
Jiangxi, China
Production Capacity
120000 Square Meter/Square Meters Per Month

Product Description

Accurate design reusable aluminium formwork concrete houses for project site

Product Category
Accurate Design Reusable Aluminium Formwork Concrete Houses for Project Site
Aluminum formwork
Climbing scaffolding
Steel props
Tunnel formwork
Column formwork
Formwork accessory
Product Description

If you ask me, what's the Most important thing in the world?

 

Developer and main contractor will tell you the Truth.

 

With the rapid development of economy, Time and Energy becomes particular important.

 

However, GETO Aluminium Formwork System save time and energy for you.

 

After that, you have more valuable time and energy to accompany with your family and friends.

 

Providing one-stop service, GETO Aluminium Formwork let you more assured and comfortable.

 

 Accurate Design Reusable Aluminium Formwork Concrete Houses for Project Site Accurate Design Reusable Aluminium Formwork Concrete Houses for Project Site

 Aluminium Formwork Benefits

Items Aluminium formwork
1. Material Aluminium alloy 6061-T6
2.Installation

After short period of training, workers can easily learn to install and dismantle the formwork.

3.Construction period 3-5 days per storey.
4.Machine assistance

Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used, such as:

1) Shifting of reinforcing steel rebar into assembly point

2) Removing debris from site

3) Loading and Unloading materials from trucks into site storage area.

5.Quality of formwork The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won't be wasted.
6.Plastering cost As the smooth effect after removing the formwork, there is no need to plaster.
7.Formwork stability The load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting.
8.Scrap value The scrap value is about 50% of the new panel.

 

Accurate Design Reusable Aluminium Formwork Concrete Houses for Project Site

Company Information

Accurate Design Reusable Aluminium Formwork Concrete Houses for Project Site

 

 

 

 

Project site

 If clients require, GETO can provide field specilist to project site for guidance within one month without

 

charge, meanwhile, GETO will invite clients' site supervisor and workers to factory for learning and

 

training.

 

 

Construction Effect

 After dismantle aluminium formwork, it can control flatness and verticality 

 

in less than 5mm the wall surface is very smooth, one-time pouring

 

molding, without plastering and second work, saving construction time, energy as well as cost.

 

Accurate Design Reusable Aluminium Formwork Concrete Houses for Project Site

Our Services

1: Your inquiry related to our product & price will be replied within 24hours.
2: Well-trained & experienced staff are to answer all your inquiries professional in English of course.
3: Working time: 8:00am - 20:30pm, Monday to Saturday.
4: OEM is highly welcomed. We have strong R&D team here to help.
5: Your business relationship with us will be confidential to any third party.
6: Good after-sale service offered, please get back if you got question. 

7. Mock up/pre-assemble in factory before delivery. Thus we can avoid some mistakes in advance and correct them.

 

 

 

 

  Accurate Design Reusable Aluminium Formwork Concrete Houses for Project Site

Exihibition Show

 GETO takes each opportunity to expand business to the world, and bring our products and new technoloty, providing the best after-serve and create the biggest value and benefits to our clients. We have attened oversea exhibition every year, inorder to let more and more clients to know us.

 

Accurate Design Reusable Aluminium Formwork Concrete Houses for Project Site

 

 

Packaging & Shipping

PACKAGE:

Standard export carton packing.

DELIVERY TIME:

Within 10-30 days after confirming order,detail delivery date should be decided according to
production season and order quantity.

 
FAQ

 

-Q-:Can I use this set of formwork to another project?

Yes, there are nearly 70% standard panels can be common reused.

-Q-:What's your packing methods?

Protection foam+heat contracted plastic film. / wooden packing(non-fumigation) / Metal pallet or depend on clients special requirement.

-Q-:What's your payment terms?

T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/ C  100%, or negotiate according to the order status

-Q-:Are you manufacturer or trader?

A: GETO is the manufacturer of aluminum formwork system for 9 years. Our group has 4 factories, cove raged every scaffolding systems.

-Q-:If I don't have construction crew knew well about your forwmork system, what can I do?

Well, we will send one or two field specialists to your construction site for guidance if you require.

-Q-: Do you have pre-mocking up service?

 Yes, we have pre-mocking up service, it depends on customer, sometimes, our clients need the cargo urgently,

then they do not need pre-mocking up, normally, we will do pre-mocking up to our customers.

-Q-: How to proceed an order for aluminum formwork?

1- Please provide completed project drawings to us.

2- GETO design engineer will work out formwork solution base on project drawings, we have a meeting to discussing details solution.

3- Construction details confirmed, sign sales contract, receiving deposit.

4- To work out shell drawings and modulation drawings.

5- Have meeting for confirming model details.

6- Production.

7- Acceptance check.

8- Shipping.

 

 How to contact us?

Send your inquiry details in the below for "free sample", click "Send" Now !!!
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Accurate Design Reusable Aluminium Formwork Concrete Houses for Project Site pictures & photos
Accurate Design Reusable Aluminium Formwork Concrete Houses for Project Site
US $120-145 / Piece
Min. Order: 500 Pieces
Diamond Member Since 2012

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company
Number of Employees
72
Year of Establishment
2010-12-16