Customization: | Available |
---|---|
Transport and Load: | 20′/40′ Container |
Wall: | Customized Wall |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
If you ask me, what's the Most important thing in the world?
Developer and main contractor will tell you the Truth.
With the rapid development of economy, Time and Energy becomes particular important.
However, GETO Aluminium Formwork System save time and energy for you.
After that, you have more valuable time and energy to accompany with your family and friends.
Providing one-stop service, GETO Aluminium Formwork let you more assured and comfortable.
Aluminium Formwork Benefits
Items | Aluminium formwork |
1. Material | Aluminium alloy 6061-T6 |
2.Installation |
After short period of training, workers can easily learn to install and dismantle the formwork. |
3.Construction period | 3-5 days per storey. |
4.Machine assistance |
Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used, such as: 1) Shifting of reinforcing steel rebar into assembly point 2) Removing debris from site 3) Loading and Unloading materials from trucks into site storage area. |
5.Quality of formwork | The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won't be wasted. |
6.Plastering cost | As the smooth effect after removing the formwork, there is no need to plaster. |
7.Formwork stability | The load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting. |
8.Scrap value | The scrap value is about 50% of the new panel. |
If clients require, GETO can provide field specilist to project site for guidance within one month without
charge, meanwhile, GETO will invite clients' site supervisor and workers to factory for learning and
training.
After dismantle aluminium formwork, it can control flatness and verticality
in less than 5mm the wall surface is very smooth, one-time pouring
molding, without plastering and second work, saving construction time, energy as well as cost.
1: Your inquiry related to our product & price will be replied within 24hours.
2: Well-trained & experienced staff are to answer all your inquiries professional in English of course.
3: Working time: 8:00am - 20:30pm, Monday to Saturday.
4: OEM is highly welcomed. We have strong R&D team here to help.
5: Your business relationship with us will be confidential to any third party.
6: Good after-sale service offered, please get back if you got question.
7. Mock up/pre-assemble in factory before delivery. Thus we can avoid some mistakes in advance and correct them.
GETO takes each opportunity to expand business to the world, and bring our products and new technoloty, providing the best after-serve and create the biggest value and benefits to our clients. We have attened oversea exhibition every year, inorder to let more and more clients to know us.
Standard export carton packing.
Within 10-30 days after confirming order,detail delivery date should be decided according to
production season and order quantity.
Yes, there are nearly 70% standard panels can be common reused.
-Q-:What's your packing methods?
Protection foam+heat contracted plastic film. / wooden packing(non-fumigation) / Metal pallet or depend on clients special requirement.
-Q-:What's your payment terms?
T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/ C 100%, or negotiate according to the order status
-Q-:Are you manufacturer or trader?
A: GETO is the manufacturer of aluminum formwork system for 9 years. Our group has 4 factories, cove raged every scaffolding systems.
-Q-:If I don't have construction crew knew well about your forwmork system, what can I do?
Well, we will send one or two field specialists to your construction site for guidance if you require.
-Q-: Do you have pre-mocking up service?
Yes, we have pre-mocking up service, it depends on customer, sometimes, our clients need the cargo urgently,
then they do not need pre-mocking up, normally, we will do pre-mocking up to our customers.
-Q-: How to proceed an order for aluminum formwork?
1- Please provide completed project drawings to us.
2- GETO design engineer will work out formwork solution base on project drawings, we have a meeting to discussing details solution.
3- Construction details confirmed, sign sales contract, receiving deposit.
4- To work out shell drawings and modulation drawings.
5- Have meeting for confirming model details.
6- Production.
7- Acceptance check.
8- Shipping.
How to contact us?