• Insulated Large Span Light Structural Steel Godown Building
  • Insulated Large Span Light Structural Steel Godown Building
  • Insulated Large Span Light Structural Steel Godown Building
  • Insulated Large Span Light Structural Steel Godown Building
  • Insulated Large Span Light Structural Steel Godown Building

Insulated Large Span Light Structural Steel Godown Building

Usage: Dormitary
Wall: Sandwich Panel Wall
Door: Sandwich Panel Door
Keyword: Moduler House
Product: Steel Frame Structure House
Application: Dorms
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2012

Suppliers with verified business licenses

Fujian, China
to see all verified strength labels (19)

Basic Info.

Model NO.
camp house-5868
Roof
Color Steel Sandwich Panel
Window
PVC Sliding Window
Floor
Plywood
Use
Carport, Hotel, House, Kiosk, Booth
Color
White
Transport Package
Steel Structure: Plastic Film Packing
Trademark
Hengxin
Origin
Fujian, China
Production Capacity
2000 Square Meter/Square Meters Per Week

Product Description

Insulated Large Span Light Structural Steel Godown Building
Product Description

Insulated large span light structural steel godown building

Details

Column 80# steel tube
Ground beam 50/75/100 U style steel (ac cording to the thickness of wall)
Floor beam 250# C style steel and 200# C style steel (for 2 floor house only)
Secondary floor beam 30# angle steel
Roof truss 80# C style steel welding
Roof purine 50# steel tube
Wall panel 50/75/100mm EPS/rock wool/PU sandwich panel,
Roof panel 30/50/75/100mm corrugated sandwich panel/ corrugated steel sheet
Corridor steel plate
Floor Magnesium board or plywood board
Door SIP door, include lock & keys
Window UPVC or Aluminium sliding window

Technical data

1)  Roof load:0.3KN/sqm
2)  Floor load:1.8KN/sqm
3)  Wind load:0.5KN/m2
4)  Earthquake resistance:magnitude-7 earthquake 

Feature:

* Adopt patent floor, the fire protection up to level A.
* Resistance: magnitude 7 earthquake, level 10 typhoon.
* Insulation: Thermal and heat, corrosion and sound, Waterproof.
* Labor and material of Economical price.
* One-stop service including : design, production, delivery, installation.
* Time Saving: speedy delivery and easy to install even by unskillful worker.

 


Insulated Large Span Light Structural Steel Godown Building

Related Products

Insulated Large Span Light Structural Steel Godown Building

Project

Insulated Large Span Light Structural Steel Godown Building

About Us

 

Insulated Large Span Light Structural Steel Godown Building Insulated Large Span Light Structural Steel Godown Building

Insulated Large Span Light Structural Steel Godown Building

Insulated Large Span Light Structural Steel Godown Building

Transportation&Packaging

Insulated Large Span Light Structural Steel Godown Building

 
FAQ

Q: Are you the factory or the trading company?
A: Certainly. We are the factory, and we can give you the best price.
Q: What's your MOQ?
A:Our MOQ is 20'GP. Any small trial order is also welcomed and can be in a further discussion.
Q: How many square meters can be loaded in 1 X 40'HQ container?
A: About 300 square meters.
Q: Can you provide samples?
A: Yes, we can. The sample will be cost 2 times of its original price but the extra cost will be return to you once you place the order.

Q: How many days needed to install the house?

.A team of 6 experienced workers can install 100sqm per day.

Q: How Is your after-sales service?
A: 1. Any question, welcome to contact us. 24 hours available for you

     2. One order, one special person to follow the whole process

     3. For the house installation, we will give you the installation drawing and installation manual. If you need, we also can send you an engineer to teach your workers, but you have to charge the double ticket, accommodation, food and salary.
Q: How many days needed to install the house?
A: For prefab camp house: 6 experienced workers 100sqm per day.

     For 20ft flat pack container house: 4 workers 4 units per day.

     For 20ft cost-effective container house: 4-6 workers 1 unit per day.

     For single storey prefab villa(100m): 4-6 workers finished all installing in 1-2 week.

     For light steel structure villa: 6-8 workers finished about 40sqm within 8-10 days

Contact Us
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2012

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
72
Year of Establishment
2010-12-16